CONSTRUCTION OF INFRASTRUCTURE WORKS FOR RECLAMATION OF ZONE K & L(400,000FEDDANS) El-Dabaa Corridor

CONSTRUCTION OF INFRASTRUCTURE WORKS FOR RECLAMATION OF ZONE K & L(400,000FEDDANS) El-Dabaa Corridor

Construction of large-scale infrastructure networks for the reclamation of Zone K & L along the El-Dabaa Corridor.

Project Overview

ICE was contracted to execute a comprehensive maintenance turnaround at one of the region's largest refinery facilities. The project involved multi-discipline maintenance activities across numerous process units within a strict 28-day window.

Networks to be installed include the following :

  • Prestressed pipeline length 29 km in diameter (1200mm to 2500mm)
  • Steel pipeline length 148 km in diameter (1200mm to 3000mm)
  • HDPE pipeline length 255 km in diameter (200mm to 1000mm)
  • UPVC pipeline length 300 km in diameter (200mm to 315mm)

Including Supply of Painting & Poly Ethelene sheet for insulation pipes external body after laying and welding every 12 mtrs.