Project Overview
CONSTRUCTION OF INFRASTRUCTURE WORKS FOR RECLAMATION OF ZONE K & L(400,000FEDDANS) El-Dabaa Corridor
Construction of large-scale infrastructure networks for the reclamation of Zone K & L along the El-Dabaa Corridor.
Project Overview
Project Overview
ICE was contracted to execute a comprehensive maintenance turnaround at one of the region's largest refinery facilities. The project involved multi-discipline maintenance activities across numerous process units within a strict 28-day window.
Networks to be installed include the following :
- Prestressed pipeline length 29 km in diameter (1200mm to 2500mm)
- Steel pipeline length 148 km in diameter (1200mm to 3000mm)
- HDPE pipeline length 255 km in diameter (200mm to 1000mm)
- UPVC pipeline length 300 km in diameter (200mm to 315mm)
Including Supply of Painting & Poly Ethelene sheet for insulation pipes external body after laying and welding every 12 mtrs.